Features of leveling the site
Owners of suburban areas, before starting to build a house, planting a vegetable garden, a garden and a breakdown of flower beds, you need to carefully level the entire territory. If this is not done, then all further efforts to improve the dacha can go down the drain. Today, there are several methods for leveling plots, each of which has its own pros and cons.
What is it and what is it for?
Land leveling is the cultivation of the soil, thanks to which the territory acquires the desired relief. The most necessary is the leveling of the suburban area when building a house, since a perfectly flat surface is required for pouring the foundation. If the territory is located on a slope, in order to level it, it is necessary to additionally import soil. Also plays a huge role leveling the soil and improving the yard in the country, in this case, the land must not only be perfectly leveled, but also divided into sections for a lawn, a garden and paths.
You can not do without leveling the suburban area and when planting a vegetable garden. If it is not fulfilled, then the moisture in the soil will be unevenly distributed, which will either lead to decay of plant roots, or the pits will be too dry.
The most difficult is the leveling of the swampy area., since it must first be covered with drainage, then with plant soil and chernozem. Autumn is considered a suitable time to prepare a garden at a summer cottage, since the territory is being dug up, until spring the soil will settle under the influence of snow, rains, absorbing all the useful substances. Leveling the soil in the country is necessary not only for building a house, preparing a vegetable garden, but also for decoration of landscape design, since on the site you will have to organize seating areas and break flower beds.
Elimination of small and large drops (in the form of depressions or elevations) will also be needed when creating garden paths.
Preparation
Leveling a suburban area always starts with garbage collectionto be removed from the territory. Then it is carried out clearing stones, weeds and stumps. After completing the preliminary preparation, the site is allowed to stand for a week, then they begin to markup into even partsusing pegs and rope. The territory is carefully examined, all the hills are leveled, the pits are filled up... Additionally carried out study of the composition of the soil, if the soil is infertile, then its top layer must be poured and black soil added.
Basic methods
Today there are several ways to correct a summer cottage, most often it is performed using special equipment or manually... You need to align the territory with determining its purpose (it can be used for construction, for decorating a garden plot, vegetable garden or for creating landscape compositions). A huge role in the choice of the alignment method is played by the nature of the irregularities (a plot with a slope must be additionally covered with earth according to the level, and swampy areas with sand). Minor irregularities can be eliminated manually, by digging up the site, in winter the soil is saturated with moisture and in the spring it will be easily leveled with a cutter.
If the territory is large, then it will be correct to level it with the help of heavy equipment (tractors, walk-behind tractors).
Manual
In suburban areas, the area of which does not exceed 8 acres, loosening and leveling of the soil is performed manually... This method is considered not costly, since the work requires only physical strength, rakes, shovels and pitchforks.
Manual alignment consists of several steps.
- Preparation... The territory is marked and removed from 10 to 20 cm of the top layer of the earth, which is poured into bags and taken to the edge of the site for temporary storage. It is worth noting that the soil should not be stored in closed bags, as it may lose its fertility.
- Checking the levelness of the site... To determine deviations, you need to drive the pegs into the ground, pull on the rope and check with a building level. All holes are covered with earth.
- Compaction of the soil. It is carried out using wooden planks or a hand roller. Then the previously removed land is poured. If the soil is too dry, it is additionally moistened by watering it abundantly. Then you need to wait for the earth to settle, this usually takes up to 3 weeks, dig up the area and level the soil surface with a rake.
With equipment
To speed up the process of leveling large areas use agricultural implements in the form of a motor cultivator or tractor... The first type of equipment is characterized by its small size and affordable price (often summer residents rent motoblocks during the preparation of the plots). Such mini-tractors are easy to operate, the operator only needs to follow the device and hold onto special levers to control the process.
The use of walk-behind tractors has one big plus. - when leveling the soil, there is no need to remove its top layer. As for the disadvantages, this technique cannot throw large holes, it must be done manually.
Tractors are most often used to level out areas with large areas.... This unit has steel knives that remove and move the top layer of the earth. The tractor is capable of capturing large layers of soil, at first the leveling is performed in one direction, then the equipment moves perpendicularly. Stony soils are cleaned with an excavator before plowing.
Upon completion of work on the site, you cannot plant anything for 3 weeks and make sure that it is not overgrown with weeds (weeds must be removed).
Recommendations
The process of leveling a suburban area is considered difficult, taking a lot of physical strength and time. Therefore, many land owners prefer to use the services of professionals who do everything quickly and correctly.
If the alignment of the territory is carried out independently on its own, then it is important to take into account the following recommendations.
- Before starting all work related to adjusting the territory, you should decide in advance on its purpose and the creation of separate zones (choose a place for placing a pool, arranging a garden and building). At this stage, it is necessary to carefully study the site plan and consult with a specialist in the field of land robots, since it is important to analyze the location of groundwater, soil composition and the possibility of further exploitation of the territory. In addition, the direction of water flow and the slope of the relief should be determined.
- Since the whole complex of land works is associated with the movement of land, it is necessary assess the complexity of this activity, taking into account the area of the site, the relief and the desired result. Part of the work (leveling small areas) can be done manually using shovels and rakes. For other manipulations, it may be necessary to use a special technique.
- The removed top fertile layer of the earth can be stored for no more than a month, otherwise all aerobic microorganisms can die, and the soil will become unusable (it cannot be enriched with oxygen).
- It is necessary to start leveling the land plot before starting the construction of a house, laying out garden paths and carrying out all communication systems. It is best to do this in the fall, since the winter-spring period can be rich in precipitation, and the soil will sag. In addition, a plot leveled in the fall for a vegetable garden during the winter is well saturated with moisture and fertilizers, which will have a positive effect on the cultivation of crops.
- Areas with large areas must be leveled using special equipment, which is capable of penetrating to a depth of 30 cm. The tractor needs to be walked along and across the territory, this will allow the earth to loosen well. If there is a need to move a large amount of soil, it is best to use a bulldozer.
- If you plan to allocate an area for a lawn for flowers, then you need to provide it with a perfectly flat surface.... For this, levels are set, a check is made for the presence of curvature. In some places, you can remove the top layer of soil, then fill in all the pits and level the bumps. If the soil is heavy, it is recommended to mix the top layer with peat and sand.
- To quickly level sloped areas, you can use the removed topsoil from other areas, which is considered unsuitable for planting... First, the slope is covered with sand, then with earth. It is allowed to leave a slight slope, it is needed so that melt and rain water does not stagnate. The square method will help to simplify the process of leveling sections with a slope, for which wooden pegs need to be driven along the perimeter of the territory and then add soil along the level of their height.
- When decorating landscape design on the site one should not forget about such a main attribute as steps. They can be arranged in the place where there are slopes on the site. If the territory is located on a hill, then one part of it can be leveled, and the other can be equipped with stairs and railings. Once the plot is leveled, fountains, small bodies of water and statues can be placed on it.
You can see how to properly align the site in the next video.
The comment was sent successfully.