Where to start renovating the kitchen?
Renovation work in no other room of the apartment will be as difficult as in the kitchen. Unlike all other rooms, here it is important to provide not only comfort, but also maximum practicality and durability, to choose the right combination of household appliances, plumbing fixtures, furniture and finishes. This task is not the easiest one, therefore it is necessary to approach its solution with all thoroughness.
First steps towards renovation
Perhaps the very first decision on the way to carrying out a full-fledged kitchen renovation is to understand how the result should look like, and what steps should lead to its implementation. To create a design project for repairs in the kitchen, it is not necessary to involve a professional designer - you can, after thinking well, draw up a plan yourself, but it is definitely not worth starting repairs in an apartment without an exact plan.
At the same time, it is necessary to correctly calculate the repair needs. For example, in a new building there is no decoration, but all communications, as a rule, are present, and they are new, that is, there is no need to replace them - accordingly, you just need to select equipment, furniture and decoration. If the same communications are still in good condition, but the need to change the finish is ripe, you need to find a way to dismantle the old coatings so as not to damage what is not planned to be replaced. As for the overhaul, in this case it is worth starting with the complete dismantling of everything, including the window block, but the sequence of further restoration should be chosen correctly.
The importance of planning
Before starting the repair, it is important not only to see the final picture, but to clearly understand what sequence of steps the plan will consist of, as well as how many consumables will be needed, and how much it will all result in. Agree, it makes no sense to first assemble kitchen cabinets, and then replace pipes inside them - so you can spoil both, create unnecessary inconveniences, and therefore lose in finances.
Experienced people do not advise to rely entirely on the very first master whose number you found - try to get even a little closer to specialists in the field of home repair. Repairmen, seeing an inexperienced newbie, are likely to try to sell you unnecessary goods and services, they will also provide a "bonus" in the form of an extra charge, so have a clear idea of what you would like to see in your kitchen after renovation, and how much it costs. Be sure to find out the prices of consumables and the cost of materials in different places - this way you will reach a fair value, and even be able to save.
When choosing consumables, focus on the main materials that are not directly related to the decor. Only by creating a reliable and durable basis for the decor, you will be sure that you have not wasted your money., because the latter can be quite expensive and lead you astray, prompting you to save where savings are inappropriate. Even after calculating everything carefully, do not grab the phone right away - put the project in your head for a while, think over the details a few more times so that there are no doubts left. If no objections come to mind (or they have already been taken into account in the final plan), it remains only to postpone the full amount of the cost of the repair - and only now you can call the masters and agree on the exact date of the work.
Phased sequence of repair work
A little earlier, we mentioned that the correct algorithm of actions, involving the stages of performing the repair in a strict logical order, is already half the success and reducing the risk of unforeseen expenses and delays. To explain in detail how a step-by-step overhaul procedure should look like, we will briefly consider all the main types of work.
Dismantling
If the repair is carried out in a new building, that is, from scratch, and there was simply no previous repair in the room, you will not have to go through this stage - there is simply nothing to dismantle. However, with a major overhaul of an old kitchen, this stage cannot be avoided, and certain difficulties may arise already here. The fact is that this step in the repair process is usually the easiest one, as you know, to break - not to build. Many owners prefer to carry out dismantling before repairing on their own, but in the case of a kitchen, this is not always so easy. - the same pipes are not so easy to disassemble without the necessary tools. If there is a man in the house who knows how to work with his hands, you can try to do it yourself, significantly saving on the services of workers, but if there is no self-confidence, you cannot do without their help. The same applies to non-capital repairs - if the task does not include the complete destruction of the kitchen to bare walls and floors, you should not risk taking apart the structures with your own hands.
An important point in dismantling is garbage disposal. There is usually a lot of it, and it can be even more difficult to take it out on your own than to destroy the old finish. Pickup may turn out to be a separate service, the cost of which should be specified in advance. Expect to buy dozens of bags, which will also cost you a certain amount.
Preparation of walls and ceilings
In general, it would be appropriate to refer this stage to dismantling, but not everyone understands that removing the same old paint is also dismantling. All that is needed first is to clean the walls down to concrete. Many types of wall and ceiling finishes require installation exclusively on a perfectly flat surface, so it makes sense to clean the walls and ceiling from dirt, grease and mold, and level them.
Window
This is the first stage when, during the renovation of the kitchen, we will not only break, but also introduce something new. As a rule, the dismantling of the old window and the installation of a new one are performed by the same masters, the whole procedure usually takes a little time - no more than two hours are spent on replacing one block. They begin with the installation of windows for the reason that their replacement provokes the destruction of the adjacent sections of the wall, which means that after finishing or even preparatory work, it is too late to do this. Please note that for many companies, the installation of the window itself and the repair of the slope are different services that are performed by different craftsmen, therefore you need to plan everything correctly so that further repairs do not spoil the fresh slope.
Electrician
This stage is quite difficult to plan, and it is in this part that inexperienced planners often make mistakes. Before doing wiring, you should think carefully about the configuration of electrical appliances in the kitchen - since we are doing a major overhaul, it is worth doing everything right away so that there is no need for extension cords and tees. If the electrical wiring is hidden in the walls, they should be punched out, and then the surface should be leveled, although today the wires are not always hidden inside for ease of possible replacement. It is important to bring out the ends of the wires for future outlets, switches and lighting fixtures, although they have not yet put covers on them, limiting themselves to protruding (and unconnected) contacts.
Pipes
The installation of plumbing structures in general resembles the installation of electrical wiring with the only difference that geographically these works are a little more limited. In terms of the renovated premises, you should think in advance about where all the equipment that needs to be connected to the water supply and sewerage system will be located.In many modern kitchens, these communications are no longer limited to just one sink - quite often in the same room you can find a washing machine, and dishwashers are becoming more and more intensive.
Wall and work area decoration
After the installation of communications, it's time to gradually move on to the stylistic design of the room. It is usually advised to start finishing work from above, gradually moving downward - so splashes and falling fragments of finishing materials will not damage the new floor, and will not even stain it - that is simply not there yet. Materials must be selected in strict accordance with the destructive conditions that develop in the kitchen. A prerequisite for any kitchen finish is increased resistance to high temperatures and moisture (both liquid and vapor). The part of the wall immediately adjacent to the working area (the so-called apron) should have even more sophisticated qualities, for example, withstand any temperature, not burn even in direct contact with fire, and also be easily cleaned of any kind of contamination.
Floor
To protect the floor from dirt or damage from working tools, they go to putting it in order last. Refining it is perhaps the most time-consuming part of a kitchen renovation. Since during capital work, it is supposed to pour a new concrete screed, and it dries very slowly. It is unacceptable to start laying on a screed that has grabbed incompletely - with such an ill-considered decision, you will greatly reduce the service life of the coating.
In some cases, the flooring steps are intertwined with the wall and ceiling steps. For example, if the main work on the preparation of the walls has been completed, and it remains only to paint them, but for some reason a long break in the work is foreseen, you can pour the concrete screed right now. Then they switch to painting the walls after it dries, but still before laying the flooring - by themselves, paint splashes on the screed are not terrible if they are then covered with a laminate or any other floor on top.
Arrangement of furniture, appliances and accessories
When all the above stages are passed, the customer has a neat and beautiful, but still empty and impractical kitchen at his disposal. Its further arrangement is divided into two stages - professional and independent. A modern kitchen is not a set of separately taken accessories - many of its components are interconnected, so the owner simply cannot cope with the installation of this entire system on his own. The final design of the same electrical system, the installation of equipment with its connection to the main communications, and even the assembly of the kitchen unit - all these are tasks that are usually entrusted to professionals. Although because of this you do not even need to know the exact order of installation, experienced people advise you to be present during such an assembly - this helps to control the quality of the work itself.
The last stage is carried out independently and involves bringing the kitchen to the final condition for everyday use. It consists in arranging furniture and dishes, hanging window textiles and general ennobling of the room, and begins with a more banal thing - general cleaning. In practice, finishing the kitchen can take several weeks, but you can use the room earlier - right after all the equipment has been connected, the headset is assembled, and the dining table is brought in.
Major mistakes
Inexperience often turns out to be a big problem for customers who, in their eagerness to do everything as quickly as possible, often face the problem of excessive and thoughtless waste of money, or even with a complete impossibility to bring their plans to life, although part of the money has already been spent. To warn readers, here are some of the most common mistakes.
The first, it is also the main mistake, is to start repairs without any plan in the hope that it will be possible to figure it out on the fly. A kitchen renovation, especially a major one, in principle cannot be extremely fast, it will certainly take several weeks, but by doing as indicated above, you risk plunging the room into chaos for months or even years. Without sufficient information about the cost of the desired result, many owners start work that are unable to finance in full, which is why the original project has to be redrawn many times right along the way. You should not be surprised if the result with such an attitude will very little resemble what was conceived, and it’s also good if the kitchen can be used in the end, simply without inviting guests to it for the time being. In the worst case, such an option is not excluded, in which it will only be possible to break everything, and there will not be enough money for adequate restoration.
Another huge mistake is going too far ahead of making money into consumables. Even with very careful planning of kitchen renovation, expectation and reality rarely coincide - there are too many details here that need to be coordinated. It's also good if, already in the process of repair, the masters or you yourself just come up with an option of how to do it better than planned - then, having the materials on hand for the implementation of the original plan, you can breathe and abandon the changes. It is much worse if it turns out that the original plan for some reason is not subject to implementation at all, or its implementation threatens with certain inconveniences during further operation. In this case, it turns out that the money for the purchased finishing was wasted, and the cost of repairs, of course, will increase - or you will have to put up with what we have.
An even more global mistake is buying furniture early. This option is even more striking work for the future, the headset itself or the table can be quite expensive, and they are selected strictly by design. Having bought such accessories, you will no longer be ready to easily change something else, which means that it will be really difficult to deviate from the original plan, even if flaws are found in it.
It is often a mistake to contact a designer. His services are expensive, but he will never do absolutely everything for you. He tries to please you as much as possible, because he will only slightly narrow down the possible choice of finishes, furniture and appliances, he will make all these details harmonize, but he will coordinate every step with you, so you still have to go shopping.
For information on where to start repairing in the kitchen, see the next video.
The comment was sent successfully.